Demo shop · Northline Cabinetry is not a real business
Northline Get a quote

How it works

From the first visit to the last screw, here's what happens and when.

How a job goes at Northline

Most kitchens take 8–10 weeks from the first visit to the last drawer.

Step 4 of 4

18"36"30"57 23/32"18"12"36"30"45 23/32"11'-9 23/32"12"36"6"24"24"3/8"8'-6 3/8"11'-9 23/32"8'-6 3/8"14235671234048"96"CEILING 8'-0" AFF
JobYour floor plan, from our measurements · drawn in WoodWright
ViewFloor plan
Scale3/8" = 1'-0"
FEFEFEFEWINDOW57 23/32"30"36"18"11'-9 23/32"45 23/32"30"36"12"18"543214 1/2"31 3/16"18 5/16"30"12"8'-0"024"48"
JobEvery wall drawn, every size on it · drawn in WoodWright
ViewElevation
Scale1/2" = 1'-0"
Built in our shop, fitted by hand
Installed
  1. 01

    Measure

    One visit · about an hour

    We measure every wall, window, outlet and vent, and check the floor and walls for level. Frameless cabinets need exact numbers, so we take our time here.

    You get: A free site visit

  2. 02

    Design

    About a week

    You get a floor plan and an elevation of every wall, with every cabinet sized to the sixteenth. We mark where the lights, outlets and pulls go. Change anything until it's right.

    You get: Drawings and a fixed price

  3. 03

    Build

    5–7 weeks

    Boxes are cut on our CNC. Fronts are edge-banded, sanded and sprayed in our own finish room. Stop by and see them before they leave.

    You get: Photo updates from the shop

  4. 04

    Install

    2–4 days

    The crew that built your cabinets hangs them. We level every box, set the lights, adjust every door and drawer, and template for your countertops.

    You get: A walkthrough and our warranty

Planning a kitchen, bath or closet?

Send a few details and photos. You'll hear back from Northline within two business days.